Resistance Movement: State of Mission Report December 2017

Google+ Pinterest LinkedIn Tumblr +

Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, grid ratio failure, in deflection. HVBN substable to stable, M minimum requirements met.

The above is a coded messages for the Resistance Movement as communicated by Cobra on Portal 2012. These messages are not meant for the general population, and are not meant to be understood by us.

This article (Resistance Movement: State of Mission Report December 2017) was originally published on The Portal and syndicated by The Event Chronicle

Share.

Comments are closed.